Plants design and construction
In addition to the production of heaters and coolers, TWK is able to realize turnkey plants, following their development from design to installation, including engineering documentation. Whenever possible, these systems are manufactured in our factory for a more efficient construction process. Over the years, we have developed a great experience in the design of heating plants, storage tanks for liquids and gases, degassing systems, pumping stations, system for loading, unloading, storage and heating diesel, LPG and fuel oils (up to 500 cSt).
Clean Steam generator plant in Containers

Description
Plant realized into the standard container, easy transport and installation, able to generate up to 800gk/h of clean saturated steam at 6 barg.
>>For more information contact the sales department.
Installation
> SpainLPG Storage & Heating plant

Description
LPG storage plant, complete of load & unload tank truck compressors group, storage collection tanks, heating system, LPG vaporizer system, and pressure reducing group to the users.
>>For more information contact the sales department.
Installation
> KuwaitHFO storage Heating and pumping station

Description
HFO Storage system up to 500 cSt , capacity 600 m3 complete of: Unload tank truck pumping group, Tank and piping heating units, HFO recirculation system, users pumping unit and other auxiliary systems.
>>For more information contact the sales department.
Installation
> Saudi ArabianDiesel Storage and pumping station

Description
Diesel storage system, capacity 60 m3 complete of: Unload tank truck system, Diesel recirculation system, n°2 Diesel collected tank with double wall and covered with fiberglass, users pumping unit and other auxiliary systems.
>>For more information contact the sales department.
Installation
> Saudi ArabianSaturated Steam production plant up to 10 Ton/h 16 barg

Description
Steam generator plant up to 10 ton/h complete of:n°2 steam generator units up to 5 ton/h, pressurized degasser unit, condensate collected tank, dosing units, degasser loading pumping unit, steam generator pimping unit, Natural gas pressure reduction group, piping plant and chimney.
>>For more information contact the sales department.
Installation
> Saudi ArabianOverheters Steam production plant up to 20 Ton/h 20 barg

Description
Steam generator plant up to 20 ton/h of overheated steam at 210°C complete of: n°1 steam generator units up to 20ton/h, pressurized degasser unit, condensate collected tank, dosing units, degasser loading pumping unit, steam generator pimping unit, Natural gas pressure reduction group, piping plant and chimney.
>>For more information contact the sales department.
Installation
> Saudi ArabianDiathermic oil distribution and regulation plant

Description
diathermic oil heating plant composed of: n°1 diathermic oil heating group up to 280°C with burner,n°9 groups of secondary circuits dedicated for each user, diathermic oil distribution pipe self-supporting structure.